Transmission

CVPS has over 600 miles of tranmission lines, and about 130 substations across the state. We have over 20 hydro generation stations, two gas turbines, one diesel plant, and 20 dams.

Control CenterA control center at the company's headquarters in Rutland operates 24 hours a day, and directs all switching for the transmission system via a Supervisory Control And Data Aquisition system. This system is operated via computers, and automatically controls over 70 substations, as well as all generation facilities, over 30 transmission switches, 650 control points, multiple data and communication systems, and over 2,000 alarm and status points.

The controllers also direct the service restoration efforts on the transmission system, substations, and distribution lines involving substations, if there are outages or repairs needed. They also coodinate with Vermont Electric Power Company, better known as VELCO, the state's transmission company, as needed; and ISO New England, a regional transmission organization that monitors and ensures New England's constant power supply.

Open Access Transmission Information

On Feb. 1, 2005, ISO New England and participating transmission owners implemented a Regional Transmission Organization (RTO) governed by ISO New England FERC Electric Tariff No. 3 - Section II Open Access Transmission Tariff (RTO OATT).  The RTO OATT superseded the OATT’s of all Participating Transmission Owners, including the CVPS OATT No. 7.  The RTO OATT covers transmission service on all network facilities including pool transmission facilities and the Highgate Converter Facilities. 

All transmission service types are briefly explained in the ISO New England matrix (see Transmission Service Types), which also contains application information.

OASIS: Registration information for access to the New England Open Access Same Time Information System (OASIS) may be found via:

Regional Network Service: Open access to integrate all resources to regional network load is provided under Schedule 9 – Regional Network Service of the RTO OATT.  Application for Regional Network Service must be made to ISO New England.  Call Bruce Kay at ISO New England at 413-535-4062 for more information.

  • Schedule 9 (See Section II Open Access Transmission Tariff)

Through or Out Service: Open access to utilize the Highgate Converter Facilities is provided under Schedule 8 – Through or Out Service of the RTO OATT.  Application for Through or Out Service must be made to ISO New England.  Call Bruce Kay at ISO New England at 413-535-4062 for more information.

  • Schedule 8 (See Section II Open Access Transmission Tariff)

Local Network or Point-to-Point Service: Open access to the CVPS transmission system is provided under Schedule 21 – Local Network Service (common provisions applicable to local service from all local service providers) and Schedule 21-CV – Local Service Schedule (provisions applicable to local service from CVPS) of the RTO OATT.  Application for firm or non-firm point-to-point transmission service over the CVPS transmission system must be made to ISO New England.  See link below for blank application.  Call Carl Scott at CVPS at 802-747-5534 for more information.

Phase I/II HVDC Service: Open access to the CVPS portion of the Phase I/II HVDC transmission facilities is provided under Schedule 20A – Point-to-Point Service over the Phase I/II HVDC Transmission Facilities and Schedule 20A-CV of the RTO OATT.  Application for firm or non-firm point-to-point transmission service over the CVPS portion of the Phase I/II HVDC transmission facilities must be made to CVPS.  See link below for blank application.  Call Carl Scott at CVPS at 802-747-5534 for more information.

Large Generator Interconnection: Large generator interconnections (over 20 MW) with the CVPS transmission system are governed by Schedule 22 – Standard Large Generator Interconnection Procedures of the RTO OATT.  A request for interconnection with the CVPS transmission system must be made to ISO New England.  Call Kevin Mankouski at ISO New England at 413-535-4133 for more information.

Small Generator Interconnection: Small generator interconnections (20 MW and under) with the CVPS transmission system are governed by Schedule 22 until Schedule 23 – Standard Small Generator Interconnection Procedures of the RTO OATT, which is under development, becomes effective no earlier than Jan. 9, 2006.

Interconnection with CVPS Distribution System: A request for interconnection with the CVPS distribution system may be made to CVPS.  Call Carl Scott at CVPS at 802-747-5534 to ascertain.

CVPS Links:

FERC Order 2004 Standards of Conduct Information and other CVPS OASIS related information can be found using the following link:

For customers with an OASIS digital certificate please use the following link:

Southern Loop Public Engagement Process:

Dozens of local residents have helped Central  Vermont Public Service and Vermont Electric Power Company find solutions to growing concerns about southern Vermont’s electrical transmission system in a first-of-its-kind public outreach gathering.

 

Transmission Lines