HOME | JOBS | CONTACT US | SITE MAP

SEARCH:
Skip Navigation Links

PROGRAMS & SERVICES

Skip Navigation LinksHome > Programs and Services > Line Extension Services > Three-Phase Overhead Extensions

Line Extension Services

Company-Constructed Line Extensions and Relocations
Three-Phase Overhead Effective Oct. 8, 2008

 
Joint w/Telephone
Not Joint w/Telephone
Application Fee (Non-Refundable)
$580
$580
 
Primary Line:
Last Pole
$1410
$1820
Each Additional Pole
$680
$980
Conductor/Foot
$6.10
$6.10
 
Secondary Line:
Last Pole
$810
$1190
Each Additional Pole
$280
$550
Conductor/Foot
$2.80
$2.80
Each Guy/Anchor/Brace Assembly, when required 
$130
$130
Additional Charge for Each Pole Set
in Rock Ledge
$410
$410
Service Drop Rating 175 Ampere
$3.20/ft
$3.20/ft
270 Ampere
$7.10/ft
$7.10/ft
330 Ampere
$8.60/ft
$8.60/ft
Service Drop Credit, if applicable
$(210)
$(210)
Each Right-of-Way in Excess of One 
$110
$220
Special Construction Charges
Actual
Actual
Act 250 Permit Charges, when required
Actual
Actual
Other Special Permit Charges
Actual
Actual
Relocation: Salvage or Removal
Actual
Actual
Utility tax liability arising under Federal Tax Reform Act of 1986
34.8%
34.8%

 

Copyright Central Vermont Public Service | Power Outage 1-800-451-2877 | Customer Information 1-800-649-2877 | webmaster@cvps.com | Terms of Use